MUNDRA – DELHI PIPELINE PROJECT TERMINAL STATIONS AT AJMER AND AWA (RAJASTHAN)


CIVIL & STRUCTURAL WORK AT TERMINALS AND STATIONS FOR MUNDRA–DELHI PIPELINE PROJECT (AJMER & AWA) OF HINDUSTAN PETROLEUM CORPORATION LIMITED

 

Client: Hindustan Petroleum Corporation Limited

Location: Ajmer And Awa in Rajasthan

Hindustan Petroleum Corporation Limited executed the Mundra-Delhi Pipe Line Project for which Civil and Structural works for terminal and stations at Ajmer and Awa were executed by us. EIL was the HPCL consultant for the implementation of this work.

The scope of the work included carrying out all civil, structural, architectural and associated electrical works for buildings at Ajmer and Awa stations, for this multi-product pipeline from Mundra in Gujarat to Delhi. The work also included site grading, roads, RCC pavements, tank foundation, fire water/hydrant system, equipment foundation construction building, and structural steelworks.

 

The following were carried out at Ajmer and Awa Stations.

 

- D.G. and Substation Building with a Total Height of More than 15 m.

- Control Room Building.

- Mainline Pump House.

- Emergency Rescue Vehicle Shed.

- Ware House

- Road Works.

- Fire-water Network with Internal Cement Lining as Per A33y Spec.

- Firewater Pump House.

- Boundary Wall.